The Iron County Forestry Project is an Improved Forest Management (IFM) project on 156,517 acres of county-owned forest in northern Wisconsin, the fourth largest county forest in the state. Acquired by the County between 1930 and 1960 and enrolled for commercial forest management, the land has long supported a robust timber program, and harvesting has historically been the County’s primary means of filling its budget gap.
Carbon revenue now allows Iron County to limit harvesting to approximately 3,200 acres per year, a roughly 30% reduction from the 4,600-acre upper bound in its 15-year Forest Management Plan, while still meeting its management goals. Registered with the American Carbon Registry, the project is expected to deliver more than 3.9 million tonnes of CO₂ emissions reductions over its first 20 years, while protecting habitat for sensitive species such as the Connecticut warbler.
The Anew – Iron County Forestry Project is located on 156,517 acres in Iron County, Wisconsin and is the fourth largest county forest in the state. The County acquired much of its landholdings between 1930 and 1960 and enrolled these acres in Wisconsin’s Forest Crop Law with the intention of engaging in commercial forest management across its ownership, reflecting the primary use of these forests since the late 1800s. Following a period of very heavy harvesting in the first half of the 20th century, timber sales were minimal until the mid 1970s, as the forest was re-establishing itself after being depleted. However, once a backlog of timber became available for harvest again by the early 2000s, the timber program grew substantially, leading to elevated harvesting levels which were maintained up to the carbon project’s commencement. Over the past few decades, Iron County has invested in its timber resources through road construction, fire protection, County Forest staff, a GIS program, and the establishment of a Continuous Forest Inventory (CFI) program to better evaluate growth and yield data—all in service of supporting a robust timber harvest program.
County funding issues have been increasingly challenging as municipalities are being required to provide more services while dealing with rising maintenance and administrative costs. Iron County is regularly seeking new sources of revenue to help offset taxes and provide community services. Historically, the County has relied on timber harvesting as the primary means for filling the budget gap. However, revenues from the carbon project will offset the need for extensive commercial timbering and decrease harvest levels meaningfully below the thresholds allowed under the 15-year Forest Management Plan (FMP). In addition to supporting the County’s general fund, carbon revenues will contribute to the acquisition of other timberlands in the County and provide the County flexibility to better manage its forestlands for long term, sustainable use.
The following quote from Iron County emphasizes how the carbon project is concretely adjusting its forest management practices:
Historically, the Iron County Forest has been managed for timber production. The carbon project gives us the opportunity to look at alternatives to maximum timber production across our forest. Degraded northern hardwood stands that may have previously been prescribed for overstory removal and even-aged management can now be evaluated for all-aged management over a longer period. Instead of starting a stand over, foresters have the option to make stand entries with longer intervals to convert these stands into quality northern hardwood stands for future sawtimber production. Swamp conifer stands and swamp hardwood stands can be managed on longer rotations and harvest intervals with carbon as a primary management goal for many of these stands.
The baseline scenario represents carbon stocking across the property under a management regime utilizing the harvest acreage thresholds allowed under the current 15-year FMP. In this scenario, the highest volume sawtimber stands are targeted for harvest as trees mature to prioritize strong financial returns for the County. The baseline scenario is fully permissible under the current FMP and conforms to all applicable provisions in the County’s Annual Work Plans, which indicate the areas from each stand type intended to be harvested annually to meet the goals of the FMP. In the absence of the carbon project, Iron County would continue to annually harvest closer to the 4,600-acre upper bound designated in Iron County’s 15-year FMP, in response to existing financial pressures on the County government. It should also be noted that the County has delivered timber to at least 14 mills in the Great Lakes Region alone, illustrating there is ample capacity to absorb the wood material that would result from the baseline harvests. Because carbon revenues can replace timber revenues, Iron County can now limit harvesting to approximately 3,200 acres per year, a ~30% reduction, and still meet its management goals of maximizing profit from its land base while protecting the County’s natural resources for present and future generations.
A conservative baseline scenario considers not only what a landowner could do, but what a landowner plausibly would do in the absence of the harvest limitations associated with a carbon project. In the below map, Anew demonstrates actual recent harvests in the project area’s region. This data speaks to the strength of local timber markets and common management practices on forested properties of comparable size and ownership type—an integral piece in informing the accuracy and viability of assumptions in the baseline scenario.
Harvest Comparison
All harvests/forest losses larger than 5 acres that happened between 2001 and 2022 within a 60 mile radius from the project area are depicted in orange, showing the very real pressures on forests in the area. The carbon project ensures sustainable management on the project area for 40 years, twice as long as the period depicted below.

Hansen, M. C et al. “High-Resolution Global Maps of 21st-Century Forest Cover Change.” Science 342 (15 November 2013 & updates): 850–53. https://glad.earthengine.app/view/global-forest-change
A strong understanding of local forest products infrastructure is key to building a realistic and conservative baseline scenario. To carry out harvests modeled in the baseline, a forest property must be within a feasible travel distance to active processing facilities. This map presents mills that are drivable from the project area along with their relative processing capacity, delineating a framework for a current or future landowner to move timber in the absence of the carbon project, thereby providing a critical piece of direct evidence to the credibility and additionality of the carbon credits resulting from the project’s activities.
Area Regional Mill Capacity
The calculated mill capacity is 9.63 million green tons within 120 miles of the project boundary, and the baseline harvest is 371,451 green tons per year in the first ten years of the project. This equates to 3.86% of the 120-mile mill capacity that is represented by the Iron County baseline.

The Iron County Project lies within the habitat range of the Connecticut warbler (Oporornis agilis), a seldom seen but important northern bird species. The Connecticut warbler prefers woody wetlands and upland jack pine stands as its habitat, which comprise over 25% of the Iron County Forestry Project area. It nests near the ground, hidden in the thick undergrowth, and typically utilizes treed areas with additional overhead cover. This specific habitat preference makes it rather mysterious and difficult to locate for humans, but it remains a key part of northern ecosystems. Connecticut warbler populations have declined significantly in recent years making it a species of Special Concern in Wisconsin, which is thought to be related to loss of its winter habitat in the Southern Hemisphere and fragmentation of its summer habitat in the Northern Hemisphere. As a result, researchers have recommended that managers reduce harvesting in areas of jack pine and woody wetlands, lessening fragmentation, and encouraging the habitat preferred by the Connecticut warbler bird. By reducing the pressure on Iron County to maximize its profits through harvesting, the carbon project is also helping to ensure the maintenance and protection of this habitat for sensitive species like the Connecticut warbler.

Project Impacts
A universal blueprint for a better world—Anew is helping deliver on the United Nations global vision for social, economic, and environmental sustainability.


The forest is considered an outdoor classroom serving all age groups. It consists of diverse communities with a large variety of plant and animal life giving ample opportunity for study and observation. Iron County encourages and supports research efforts that relate to the forest and educational opportunities that will promote a better understanding of forest communities and management.
Iron County is home to an abundance of surface water resources including 754 acres of lakes, rivers, streams, ponds and other aquatic features, and 13,870 acres of non-forested wetlands providing habitat for a variety of common, rare, and endangered species. In addition, undisturbed shoreline and riparian forests provide valuable habitat for species such as Red-shouldered Hawk, green frog, and woodland jumping mouse. Iron County uses Integrated Resource Management, which involves considering the ecological, physical, economic, and social aspects of all aquatic and terrestrial natural resources in developing sustainable, multiple-use management plans. This ensures harvesting and management activities are conducted in alignment and support of long-term stewardship of water, soil, habitat, and recreational resources.

The forest industry and tourism are the number one and number two ranked employers for the county. Sustainable, multi-use forest management as supported by the carbon project will support jobs associated with timber management and ensure long term availability of forest resources and recreation for outdoor tourism.
The Iron County Forest is open to the public for many recreational activities including hiking, hunting, fishing, trapping, skiing, and motorized recreation. Users can also utilize the forest for dispersed camping, backpacking, birdwatching, and whatever other types of uses one would like to enjoy on their forest lands. There is a harbor on the property that is a culturally significant site as it was used during early tribal settlement.
Iron County manages its forest resources for long-term sustainability, which helps mitigate the risk of damaging events associated with climate change, such as high winds and flooding, and ensures existing and future carbon stocks are protected for the duration of the carbon project.
Iron County forests provide a wide range of wildlife habitat including forested and aquatic ecosystems, prairies, bogs, and rock outcroppings. The property is home to the Penokee Range Biological Reserve Area, a high conservation value area designated as a ‘no management’ zone. It contains valuable bird habitat and numerous threatened and endangered species, such as high concentrations of Black-throated Blue Warblers and Golden-winged Warblers. The County manages acres adjacent to this area with limited, selective, and uneven-aged harvesting strategies to enhance habitat for critical species. Management objectives across the property also support Ruffed Grouse and white-tailed deer.

Conservation Credits
Conservation credits account for climate benefit coming from the protection of the project area. Emissions that would have been released if the land was instead harvested in the absence of the project are quantified. Many of the co-benefits associated with forestry projects are inherently linked to the preservation of existing forest stands.
Removal Credits
As the newly protected trees grow, carbon is pulled from the atmosphere and sequestered in the trees’ wood material through the most proven direct air capture technology on the planet, photosynthesis.